Research Forest Lakeside 2

The Woodlands, TX

The first of eight new office buildings completed on the Research Forest Lakeside campus, Building 2 is a 67,896 square foot, three-story Class A building featuring lakeside vehicular access, offering tenants and visitors the opportunity to enjoy the site’s natural beauty. The designer’s use of full-height glass and punched windows affords views of forest preserves and native lakeside landscaping. The building’s floor plates utilize highly efficient column free corners.

In keeping with the commitment of both owner and architect to incorporate responsible environmental design into every aspect of the development; Building 2 attained a LEED Silver Certification. At ground breaking in 2011, it was the only Class A speculative office built in The Woodlands area and only one of three in the Houston metropolitan area. Research Forest Lakeside 2 was completed by ZC+O, a strategic association between Ziegler Cooper and Odell.

Previous
Previous

800 Bell

Next
Next

1111 Travis